Water

Groundwater flow model Potsdam-Mitte

Project details

  • Focal points: Groundwater modelling
  • Term since 2021
  • ProPotsdam GmbH
  • Contents:
    1. Expert assessment of the potential impact of the planned construction projects on groundwater conditions in conjunction with the existing building stock
    2. Evaluation of the construction of several underground car parks as part of the urban development of the "Staudenhof and Bildungsforum area, taking into account existing buildings" site

SIMILAR PROJECTS

Wind farm Krummensee 3 - Hydrological report for early CEF measure