Environment

Environmental Due Diligence ("Quick Check") for a land development near Hamburg

Project details

  • Project description: As part of a planned property purchase of a former industrial site, the site-related framework conditions were to be examined.
  • Our services: Preparation of a desktop study ("quick check") to examine the site-related framework conditions with regard to planning law, geotechnics, contaminated sites, explosive ordnance, nature and species protection, supply and disposal, traffic and noise; advising the client with regard to necessary further investigations (building pollutant investigation, subsoil and contaminated site investigation, species protection potential analysis and mapping, drainage concept); coordination of the necessary specialist reports via the relevant specialist departments of the M&P Group and external subcontractors.
  • Term: 2021 - 2022
  • Client's industry: Property developer in the logistics sector

SIMILAR PROJECTS

Calculation of CO2 footprint Scope 1 / 2 / 3 , selection of suitable offset projects
CO2 footprints for 3 locations in Germany
CO2 footprint and ESG report for the group including approx. 10 independent GmbHs in Germany